Cisco announces the end-of-sale and end-of life dates for the Cisco® VFrame Data Center. The last day to order the affected product(s) is January 29, 2010. Customers with active service contracts will continue to receive support from the Cisco Technical Assistance Center (TAC) as shown in Table 1 of the EoL bulletin. Table 1 describes the end-of-life milestones, definitions, and dates for the affected product(s). Table 2 lists the product part numbers affected by this announcement. For customers with active and paid service and support contracts, support will be available until the termination date of the contract, even if this date exceeds the Last Date of Support shown in Table 1.
Table 1. End-of-Life Milestones and Dates for the Cisco VFrame Data Center
Milestone
Definition
Date
End-of-Life Announcement Date
The date the document that announces the end of sale and end of life of a product is distributed to the general public.
July 31, 2009
End-of-Sale Date
The last date to order the product through Cisco point-of-sale mechanisms. The product is no longer for sale after this date.
January 29, 2010
Last Ship Date: App. SW, HW
The last-possible ship date that can be requested of Cisco and/or its contract manufacturers. Actual ship date is dependent on lead time.
April 29, 2010
End of SW Maintenance Releases Date: App. SW
The last date that Cisco Engineering may release any final software maintenance releases or bug fixes. After this date, Cisco Engineering will no longer develop, repair, maintain, or test the product software.
January 29, 2011
End of Routine Failure Analysis Date: HW
The last-possible date a routine failure analysis may be performed to determine the cause of product failure or defect.
January 29, 2011
End of New Service Attachment Date: App. SW, HW
For equipment and software that is not covered by a service-and-support contract, this is the last date to order a new service-and-support contract or add the equipment and/or software to an existing service-and-support contract.
January 29, 2011
End of Service Contract Renewal Date: App. SW
The last date to extend or renew a service contract for the product.
April 26, 2012
End of Service Contract Renewal Date: HW
The last date to extend or renew a service contract for the product.
April 26, 2014
Last Date of Support: App. SW
The last date to receive service and support for the product. After this date, all support services for the product are unavailable, and the product becomes obsolete.
January 28, 2013
Last Date of Support: HW
The last date to receive service and support for the product. After this date, all support services for the product are unavailable, and the product becomes obsolete.
January 28, 2015
HW = Hardware, OS SW = Operating System Software, App. SW = Application Software
Table 2. Product Part Numbers Affected by This Announcement
End-of-Sale Product Part Number
Product Description
SV-VFDC-HA-K9
VFrame DC High Availability Appliance
SV-VFDC-HA-K9=
VFrame DC High Availability Appliance
SV-VFDC-K9
VFrame DC Base Appliance
SV-VFDC-LIC-FAB
VFrame DC Fabric License
SV-VFDC-LIC-FAB=
VFrame DC Fabric License
SV-VFDC-LIC-SGL
VFrame DC Single Server Access Port License
SV-VFDC-LIC-SGL=
VFrame DC Single Server Access Port License
Product Migration Options
There is no replacement available for the Cisco VFrame Data Center at this time.
Customers can use the Cisco Technology Migration Plan (TMP) to trade in products and receive credit toward the purchase of new Cisco equipment. For more information about Cisco TMP, go to: http://www.cisco.com/go/tradein/. The Cisco TMP application requires all users to have a Cisco.com user ID.
Service prices for Cisco products are subject to change after the product End of Sale date.
For More Information
For more information about the Cisco End-of-Life Policy, go to: